The project involves the construction of approximately 6 km of additional road lanes along Emirates Road (E611) in the Emirate of Ajman, extending between Al-Zubair Interchange and Al-Muhathab Interchange. The project aims to enhance road capacity, improve traffic flow, reduce congestion, and strengthen connectivity along this key transport corridor. The works contribute to improving the efficiency, safety, and overall performance of the existing road network to accommodate growing traffic demand.
Key Project Objectives
- Road Capacity Enhancement: Increase the carrying capacity of Emirates Road through the construction of additional traffic lanes.
- Traffic Flow Improvement: Improve traffic distribution and reduce congestion along the project corridor.
- Road Network Connectivity: Enhance connectivity between Al-Zubair Interchange and Al-Muhathab Interchange.
- Road Safety: Support safer and more efficient traffic operations through appropriate road infrastructure improvements.
- Infrastructure Development: Strengthen the existing transport network to accommodate future traffic growth.
- Transportation Efficiency: Improve travel efficiency and support the movement of people and goods along this strategic corridor.

