Total number of projects: 100+ projects
Client : Ministry of Infrastructure Development
Location : Approximately twenty (20) federal roads in different Emirates (Eastern and Northern)
Client : | Ministry of Infrastructure Development |
Location : | Approximately twenty (20) federal roads in different Emirates (Eastern and Northern) |
Start Date : | 17 January 2019 |
Completion Date : | January 2020 |
Approximately twenty (20) federal roads in different Emirates (Eastern and Northern)
Total length of an estimated 700 kilometers. Which includes, Asphat Maintenance, SHoulders, Fences and Concrete Barriers, Sand Removal, Culverts and STorm water systems and pumps, Traffic signs and Marking, Road Lighting, Graffitti Removal, Vegetation Removal,
Client : Dubai Municipality
Location : Mushrif Park Area
Client : | Dubai Municipality |
Consultants : | Dubai Municipality |
Location : | Mushrif Park Area |
The Project Consists of earthwork of around 2million m3, of imported material as well as 200,000 m3 of cut and fill in the area of 100 hectars.
Client : Dubai Municipality
Location : Furniture Market, Al Manarah Road, Nad Al Sheba 3rd
Client : | Dubai Municipality |
Consultants : | Al Turath Engineering |
Location : | Furniture Market, Al Manarah Road, Nad Al Sheba 3rd |
Completion Date : | 29 February 2020 |
Providing Entry and Exit road to new Furniture Market in Nad Al Sheba 3rd and associated work as well as trafic signal.
BGC has provided the following Services:
1) Earthwork,
2) Road Pavement, including sub base, road base, AC base course, AC wearing Course,
3) Kerbstones and Interlocking tiles,
4) Street Lighting Work, including solar lights,
5) Road Marking and Traffic Signs,
6) Traffic Signal, Cantilever and perdestrain Type.
7) Protection of the 132kv DEWA lines, and well as the waterlines.
8) Guard rails and Crash barriers,
9) Protection of Etisalat and DU lines.
Client : Dubai Int’l Real Estate
Location : Al Mina, Dubai
Client : | Dubai Int’l Real Estate |
Location : | Al Mina, Dubai |
Start Date : | December 18, 2019 |
This project includes construction of roads, with road markings, laying PVC sleeve ducts for irrigation and electricity services, and interlock pavements.
Client : United Arab Emirates Ministry of Infrastructure Development
Location : Fujairah
Client : | United Arab Emirates Ministry of Infrastructure Development |
Consultants : | Core Engineering Consultancy |
Location : | Fujairah |
Start Date : | January 23, 2020 |
Completion Date : | May 22, 2020 |
New Construction of Asphalt Road, Drainage System and Culverts.
Maintenance of Roads in all Emirates, Bridge Accessories and Culverts.
Inclusions of the Contract Services:
1. Road Works
2. Drainage System
3. Culverts
4. New Guard Rail Installation & Rectification
5. Removal and Replacement of Asphalt (Milling & Laying)
6. Patch works
7. Cleaning of Culverts
8. Rectification of Culverts
9. Rectification of Expansion Joints
10. Reapplication of Road Markings
11. Rectification of Traffic Signs
Client : Ministry of Infrastructure Development
Location : Difference location in UAE
Client : | Ministry of Infrastructure Development |
Consultants : | MOID |
Location : | Difference location in UAE |
Start Date : | 03 March 2017 |
Completion Date : | 02 March 2019 |
21 Numbers of Federal Roads in different Emirates (Eastern and Northern)
Total length of an estimated 700 kilometers.
Client : Roads and Transport Authority
Location : Sheikh Rashid Road
Client : | Roads and Transport Authority |
Consultants : | CH2M – Halcrow International Partnership |
Location : | Sheikh Rashid Road |
Start Date : | 23 July 2017 |
Completion Date : | 17 May 2018 |
This project is to provide a link between the Culture Village Phase 1 (CV1) in Al Jadaf area with Sheikh Rashid Road in order to ensure adequate access for the developed plots (Versace Hotel and Sheikh Mohammed Museum) and for the ones under development currently.
Client : Fly Dubai
Location : Al Warsan
Client : | Fly Dubai |
Consultants : | PMK / DEWAN Architects & Engineers |
Location : | Al Warsan |
Start Date : | 07 May 2017 |
Completion Date : | 27 February 2018 |
The location is well served by the surrounding transport network and considering the future expansions at DWC. Project’s work included establishment of the site boundary, and set grading for Flydubai Headquarters plot, which is the basis of the formation level of buildings, road alignments, and landscape area of the constructed facility.
Client : Ministry of Public of Works
Location : Raqaeb & Salama Bridge
Client : | Ministry of Public of Works |
Location : | Raqaeb & Salama Bridge |
This Projects consists of the constrcution of Internal roads in Raghaeb Area and also constrcution of Roads, Ramps, Loops and ROund Abouts in Salma Area.
Client : Road and Transport Authority
Location : Dubai, UAE
Project Value : | 9,462,465.00 Dhs |
Client : | Road and Transport Authority |
Consultants : | AECOM Middle East Ltd. |
Location : | Dubai, UAE |
Start Date : | 01 August 2017 |
Completion Date : | 27 July 2019 |
The work under this contract comprises of all rectification, repair, reinstatement and new construction works related to the road assets along (but not limited to) the Metro Green Line including asphalt pavements, footpaths, kerbstones, storm water drainage systems etc. in the Emirates of Dubai.
Client : Dubai Municipality
Location : Al Awir 1st
Project Value : | 42,688,197.98 Dhs |
Client : | Dubai Municipality |
Location : | Al Awir 1st |
Start Date : | 21 July 2015 |
Completion Date : | 26 September 2016 |
The works including site clearance, cutting, filling extra material shifting to adjacent plot and leveling.
Client : Dubai Municipality
Location : Al Warsan
Client : | Dubai Municipality |
Location : | Al Warsan |
Start Date : | 12 March 2014 |
Completion Date : | 31 July 2014 |
This project comprises of construction of truck parking in Warsan (existing parking enlargement), including traffic signs and road markings. The preparation of existing ground is guaranteed, including levelling out undulation and setting site to attain optimum condition needed for permanent works.
Client : Dubai Municipality
Location : Al Warsan
Client : | Dubai Municipality |
Location : | Al Warsan |
Start Date : | 18 October 2017 |
Completion Date : | 11 April 2018 |
This project comprises the construction of access asphalt road (entrance & exit) for hardware building material market including road marking and kerbstone work at Warsan.
Client : Dubai Municipality
Location : Al Awir 1st
Client : | Dubai Municipality |
Location : | Al Awir 1st |
Start Date : | 19 November 2015 |
Completion Date : | 24 March 2016 |
The Project include construction slope staking, road base laying & rolling for access road, mobilization, site leveling for water well & lagoon, removal and re-fixing of fence, and temporary sign board fixing.
Client : MOPW – Ministry of Public Works-Dubai
Location : Fujairah, Kalba, Zubaida Al Dhaid-AUE
Client : | MOPW – Ministry of Public Works-Dubai |
Consultants : | Core Engineering & Consultants |
Location : | Fujairah, Kalba, Zubaida Al Dhaid-AUE |
Activities : | Pressure Gas pipe Line, High Voltage Overhead Lines and Water main Line installations and All Utility services ducts |
Client : Emirates Flight Catering
Location : Dubai Airport Cargo Village
Project Value : | 13,700,401.00 Dhs |
Client : | Emirates Flight Catering |
Consultants : | IO Consultants DWC LLC, NEB Engineers Architecture and Project Managers |
Location : | Dubai Airport Cargo Village |
Start Date : | 24 September 2014 |
Completion Date : | 24 January 2019 |
This project comprises of relocation, protection and extension of all utility services of water main, sewerage, storm drainage, HV/LV cables and gas pipe lines.
Client : Emirates Flight Catering
Location : Al Qarhoud
Client : | Emirates Flight Catering |
Location : | Al Qarhoud |
Client : Ministry of Public Works
Location : Sharjah
Client : | Ministry of Public Works |
Consultants : | Core Engineering Consultancy L.L.C |
Location : | Sharjah |
Start Date : | 28 August 2014 |
Completion Date : | 01 August 2015 |
The Project was allocated in different sites for construction, upgrading, improvement for Links Roads to Residential complexes:
Link Roads | Length |
---|---|
Road Link to Al Haraya complex in Khorfakan | 3500meter |
E99 Road Link to Kalaba | 900meter |
Road Link to Zubaida - Al Dhaid | 3100meter |
Riffa Road-Ras Al Kaima | 1560meter |
Client : Intermass Engineering & Contracting LLC
Location : Al Jadaf, Dubai UAE
Client : | Intermass Engineering & Contracting LLC |
Consultants : | Alturath Engineering Consultant |
Location : | Al Jadaf, Dubai UAE |
Start Date : | 11 December 2018 |
Completion Date : | 27 November 2019 |
The project comprise of construction of road including ground investigation, site works, earth works, road and paving water supply pipe works, street lighting works & irrigation works
This work also includes diversion relocation and protection of utilities (DEWA water, electrical, Etisalat, DM & etc).
Client : Dubai Petroluem
Location : Margham Road
Client : | Dubai Petroluem |
Location : | Margham Road |
Start Date : | 30 May 2018 |
Completion Date : | 10 July 2018 |
Construction Period: 40 Days
Project comprises of construction of road works using full depth cold in place recycling method. Recycling shall be done in various stages continuously without any gap, namely: recycling, compaction using sheep foot roller, leveling and compaction with steel roller, micro cracking and curing.
This project completed while the plant was in operation and the work completed in 40 days.
• Cold in place recycling has been determined as most effective and environmental friendly solution vs. conventional methods in which the following principal goals will be met:
• Higher quality and longer life durability.
• Minimum 50% saving on construction time.
• Life cost effective solution.
• Major saving on human and machinery depreciation.
• Non destruction on natural resources.
• 100% saving the existing road materials (recycling)
• Less disruption in traffic flow.
• Less material transportation, hence less damage to the existing roads.
Client : MOID
Location : Emirates Road
Client : | MOID |
Consultants : | MOID |
Location : | Emirates Road |
Start Date : | May, 2019 |
Completion Date : | July, 2019 |
The Truck lane of Emirates Road, E611, was severly damaged due to the excess load and the employer wants us to provide a technically sound and commercially compatible solution to rectify the road in the stretch of 16 KM.
The Cold in Place Asphalt Recycling along with two layers of asphalt while the wearing course was designed for PMB was proposed, and after approval was implemented in the summer of 2019.
The project consists of the followings:
Client : RTA
Location : Ras Al Khor-Dubai
Client : | RTA |
Consultants : | Aecom |
Location : | Ras Al Khor-Dubai |
Start Date : | June 2018 |
Completion Date : | July 2018 |
The section of the road which was fully damaged is slected by RMS specialist and the Consultant AECOM to be upgraded using Cold in Place Asphalt Recycling.
The Area was divided in 4 segments, segment one and segment two were done as full depth reconstruction using conventional method, segment one, with 200mm sub base, 150mm road base 70mm AC base course and 50mm AC wearing course. the second segment was done full depth construction , with 200mm sub base, 150mm wetmix, 70mm base course High Modulus Asphalt EME and 50mm Betoflex wearing course. The third and the fouth segments done using cold in place asphalt recycling, with 250mm cement stabilized road base, and for segent three, 70mm BC and 50mm Polymer Modified bitumen asphalt wearing couse, and the forth segment done with 70mm BC and 50mm AC wearing course. The EME and Betoflex asphalt is lisenced by AFC.